Services Why Us How It Works Projects Coverage Blog Call 786-496-0311
Call 786-496-0311
GPR Scanning · Miami · Orlando · Tampa · Statewide

FLORIDA
CONCRETE
SCANNING

From Brickell high-rises and Fort Lauderdale garages to Orlando hotels and Tampa condos, Florida is built on post-tensioned concrete. We map the tendons, rebar, conduits, and private utilities before you core, saw, anchor, or trench.

1000+
Projects Completed
99%
Detection Accuracy
24hr
Report Turnaround
⚡ THE REAL COST OF SKIPPING A SCAN
✕
Without GPR
  • 💥
    Hit Post-Tension Cable
    $15,000+
  • ⏱
    2-Week Site Shutdown
    Schedule blown
  • ⚡
    Cut Electrical Conduit
    $4,000+
  • 💧
    Damaged Water Line
    $10,000–$25,000
  • ⚖️
    Liability & Legal Exposure
    Unpredictable
Avg. Risk: $15,000+
✓
With GPR
  • 📍
    Every PT Cable Located
    Marked on slab
  • ✅
    Project Stays on Schedule
    Zero stoppages
  • 📄
    PDF Report in 24 Hours
    Ready for your crew
  • 🎯
    99% Detection Accuracy
    Drill with confidence
  • 🛡
    Full Liability Protection
    Documentation on file
Starting at $500
Call 786-496-0311 — Book Your Scan

OUR
SERVICES

From a plumbing core through a post-tensioned condo deck in Miami to a full private-utility map on an Orlando commercial site, we give your crew the data before the first cut.

01
CONCRETE SCANNING

We locate and layout rebar, post-tension cables, conduits, and voids before any drilling or cutting begins — clear accurate markings left on-site, backed by a same-day PDF project summary report with field photos, findings, and marked safe-drill zones.​​​​​​​​​​​​​​​​

02
UTILITY LOCATING

Underground gas, electric, water, sewer, and telecom — located with GPR, APWA color-coded, and marked on-site ahead of any trenching or excavation. Every locate comes with a same-day scaled utility map, KML file, and our project summary report.

03
DRILL CREW COORDINATION

Need Coring or Cutting? We connect you with a vetted local crew from our partner network — no vendor hunting on your end. Our partnership volume means better pricing than going direct, and we handle the scheduling. One call gets you the scan, the report, and the drill crew lined up.​​​​​​​​​​​​​​​​

COMPLETED
PROJECTS

Recent work from our Salt Lake City and Nashville teams. Same GPR equipment, same on-slab markings, same 24-hour reports we bring to every Florida job.

Red post-tension tendon and yellow rebar markings on a slab underside - Salt Lake City project
Concrete Scanning · Salt Lake City

PT Ceiling Scan Before Heavy Anchoring

A restaurant contractor needed to hang a 4-ton kitchen vat from a post-tensioned deck. Our scan showed several of the planned anchor holes landing directly on tendons. They were shifted into clear concrete before drilling started.

Scope: PT deck scan, 3 anchor areas

WE PROTECT
YOUR PROJECT

01
99% Detection Accuracy

Our GPR equipment and interpretation protocols consistently identify rebar, conduits, and tension cables — even in thick or congested concrete slabs, and any underground utilities.

02
Reports in 24 Hours

You get a full PDF drill guide or utility report & KML Map delivered within 24 hours — so your schedule doesn't slip waiting on data.

03
On-Site Chalk Markings

We mark every finding directly on the slab with color-coded chalk so your driller has clear guidance at the hole — not just on paper.

04
$500–$2,000 vs. $50,000+

A scan costs a fraction of what a hit cable, broken conduit, or cut rebar costs. One job saved pays for years of scanning.

AVERAGE DAMAGE COST BY TYPE
Hit Post-Tension Cable $40–$80K
Cut Electrical Conduit $15–$30K
Damaged Water Line $10–$25K
Rebar Breach + Delay $5–$15K
GRT Scan Cost $500–$2K
PROTECT YOUR PROJECT
Scanning starts at $500. Request a callback today.
Call 786-496-0311

SIMPLE.
FAST. RELIABLE.

01
Request a Scan

Call or submit a request online. We confirm your job details, address, and scanning needs — usually same or next-day scheduling.

02
We Scan On-Site

Our tech arrives with GPR equipment, scans the defined areas, and marks all findings directly on the slab with color-coded chalk.

03
Report Delivered

A full PDF report — findings summary, scan photos, slab data, and drill guidance — lands in your inbox within 24 hours.

04
Project Moves Forward

Your crew drills, cuts, or trenches with full confidence. No surprises, no stoppages, no expensive damage.

WHAT OUR
CLIENTS SAY

"

Safety is our top priority. Their GPR services gave us the exact data needed to ensure our concrete drilling was safe and fully compliant. No surprises, no accidents.

J
John D.
Site Supervisor
"

We've faced major delays before due to undetected rebar. With GRT, we avoided any surprises and had smooth, on-time project completion. Professional from start to finish.

D
David P.
Project Manager

SERVING
FLORIDA
CONTRACTORS

We work with GCs, concrete restoration contractors, plumbers, electricians, fire protection crews, and excavation companies across Florida, from condo balcony and garage restoration on both coasts to high-rise tenant improvements in Brickell, downtown Orlando, and Tampa.

Miami-Dade: Miami, Miami Beach, Brickell, Coral Gables, Doral, Hialeah, Aventura, North Miami, Kendall, Homestead.
Broward: Fort Lauderdale, Hollywood, Pompano Beach, Plantation, Sunrise, Coral Springs, Pembroke Pines, Miramar, Deerfield Beach.
Palm Beach County: West Palm Beach, Boca Raton, Delray Beach, Boynton Beach, Palm Beach Gardens, Jupiter.
Statewide: Orlando, Tampa, St. Petersburg, Clearwater, Jacksonville, Fort Myers, Naples, Sarasota, Port St. Lucie, Tallahassee, Gainesville.

Post-Tension Decks
Condo Restoration
Milestone Inspection Repairs
Parking Garages
High-Rise & Hospitality
Tenant Improvements
Multifamily
Private Utilities
GET IN TOUCH
Phone
786-496-0311
Hours
Mon–Fri 7am–6pm
Primary Market
South Florida & Statewide

FREQUENTLY
ASKED

How much does concrete scanning cost in Florida?

Most Florida scans start at $500 and run $500 to $2,000, depending on how many areas we scan and how busy the slab is. Repairing a cut post-tension tendon or conduit commonly runs $10,000 to $80,000.

Are Florida buildings usually post-tensioned?

Many are. Post-tensioned elevated slabs are common in the high-rise condos, hotels, office towers, and parking garages from Miami and Fort Lauderdale to Orlando, Tampa, and Jacksonville. Cutting a tendon is dangerous and expensive, so any core, anchor, or saw cut through a PT deck should be scanned first.

Do you scan for condo restoration and milestone inspection repairs?

Yes. Florida's milestone inspection law and structural integrity reserve studies are driving balcony, slab, and garage repairs at condo buildings across the state, especially on the coasts. Those repairs mean coring, chipping, and cutting concrete, so we map the tendons, rebar, and conduit first to keep the repair from creating new damage.

Doesn't Sunshine 811 already mark the utilities?

Sunshine 811 notifies utility companies, who mark the lines they own, typically up to the meter. Privately owned lines on your side of the meter, such as site lighting, irrigation, sewer laterals, and feeds to outbuildings, aren't marked. We locate and mark those private lines with GPR. Florida law still requires you to contact Sunshine 811 at least two full business days before digging.

What areas in Florida do you serve?

We serve all of Florida. In South Florida that includes Miami, Fort Lauderdale, West Palm Beach, Boca Raton, and the rest of Miami-Dade, Broward, and Palm Beach counties. Statewide we cover Orlando, Tampa, St. Petersburg, Jacksonville, Fort Myers, Naples, Sarasota, Port St. Lucie, Tallahassee, and Gainesville.

How quickly do you deliver scan reports?

Findings are marked on the concrete or ground while we scan, so your crew can keep working. The full PDF drill guide or utility report follows within 24 hours.

What is APWA color coding for utility locating?

APWA (American Public Works Association) color codes standardize how underground utilities are marked: red for electric, orange for telecom, yellow for gas, blue for drinking water, green for sewer, purple for reclaimed water and irrigation, pink for temporary survey marks, and white for the proposed dig area. All of our utility reports follow these standards.

New to scanning? Read our guide: Concrete Scanning Before Core Drilling or Saw Cutting: Why It Matters

READY TO SCAN YOUR SITE?
Call 786-496-0311